Restore Electrical Distribution System, APOD, Pristina, Kosovo

Restore Electrical Distribution System, APOD, Pristina, Kosovo

IN Construction, Engineering & Architecture
Investor Name:
Published Date:
January 1, 1970
Location:
Value:
Architecture:
About Project

Client: NSPA

Location: Military Airport, Slatina, Kosovo

Year: 2022

This initiative encompassed the modernization of the Camp’s power infrastructure, shifting from reliance on fossil fuels to integration with the local power distribution system. The upgraded system includes overhead and underground power mains, transformer stations, automated systems, backup generators, and a connection to the new build electrical substation, along with initial interim operation and maintenance.